CK-104 LONG LEAD Part with NSN 5910-00-113-5499 by Crl Components Inc - Request a Quote

PRODUCT DETAILS

“*” Symbols for mandatory fields

CONTACT INFORMATION

Note : We will not share your information to any third parties.

   * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.
Mfg Part Number :   CK-104 LONG LEAD
Alternate P/N : CK104LONGLEAD
Item Name : capacitor fixed cer
Manufacturer:   Crl Components Inc
NSN :   5910-00-113-5499
CAGE Code :  71590
FSC :   5910 Capacitors

Looking for part number CK-104 LONG LEAD? Your searched part number CK-104 LONG LEAD Capacitor Fixed Cer manufactured by Crl Components Inc 71590 (CAGE Code) is available in stock and ready to ship. The national stock number of this part number is 5910001135499 and FSC is 5910 Capacitors. Please fill out the form provided below with as much information as you can and we contact you in 15 minutes.

ASAPfulfillment.com is a leading distributor of Crl Components Inc obsolete and hard-to-find NSN part number CK-104 LONG LEAD; we also specialize in high quality aircraft engine components. We have a vast inventory of over 10 million parts which are sourced from over 5,000 NSN part manufacturers. All parts are organized in 26 different categories with distinct supply codes.

Our experienced sales team will get back to you on your requested quote. Reach us on our 24/7 toll-free number, +1-714-705-4780. You can also email your Bill of Materials (BOM) to sales@asapfulfillment.com to expedite the purchasing process.



NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-113-5499

Item Description:

Capacitor Fixed Cer

59100011354990PA
CIICHCCESDPMICCriticalityENAC
UAA0
Part NumberISCRNVCRNCCHCCMSDSSADC
Ck-104 Long LeadB1CA

Characteristics Data of NSN 5910-00-113-5499, 5910001135499

MRCCriteriaCharacteristic
AAQLBODY STYLEW/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE
AARGRELIABILITY INDICATORESTABLISHED
AARHRELIABILITY FAILURE RATE LEVEL IN PERCENT0.0010
ABJTTERMINAL LENGTH1.250 INCHES MINIMUM
ADAQBODY LENGTH0.290 INCHES NOMINAL
ADATBODY WIDTH0.290 INCHES NOMINAL
ADAUBODY HEIGHT0.090 INCHES NOMINAL
AEBPCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH0.200 INCHES NOMINAL
AEBTTERMINAL DIAMETER0.025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODE(S)
CQBFINSULATION RESISTANCE AT MAXIMUM OPERATING TEMP10000.0 MEGOHMS
CQBQCAPACITANCE VALUE PER SECTION0.100 MICROFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION100.0 DC SINGLE SECTION
CRTPTOLERANCE RANGE PER SECTION-10.00/+10.00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP100000.0 MEGOHMS
CWPMDISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT2.5000
CWSGTERMINAL SURFACE TREATMENTSOLDER
NHCFNUCLEAR HARDNESS CRITICAL FEATUREHARDENED
TESTTEST DATA DOCUMENT81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD
ZZZKSPECIFICATION/STANDARD DATA81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION

Upload RFQ
usa-flag

We are proud to supply every branch of the United States military

Low Price

Warrantied inventory at competitive prices

Find it fast

Search the world's largest inventory of electronic components by manufacturer, category or part number

Get it fast

All inventory ready to ship from our sellers

Quality guaranteed

We sell only warrantied and traceable parts

asapSemiconductor's Certifications and Memberships

Thank You for Visiting Us today!

We are most trusted and leading distributor for aviation parts. You can get a quote within 15 minutes for your desired part. Quote Now!

Request for Quote

We use cookies to ensure that we give you an amazing experience on our website. If you continue to use this site we will assume that you are happy with it.